Connect with us

Breaking

DOST to present locally designed train set to PNR by October

Published

on

Philippine National Railway. Photo courtesy of PNR Facebook page.

Philippine National Railway. Photo courtesy of PNR Facebook page.

MANILA — The Department of Science and Technology Metals Industry Research and Development Center (DOST-MIRDC) has developed a train set design which will be presented to the Philippine National Railways (PNR) by October.

”The design will be presented to us (PNR) next week or October,” Reuben Besmonte, PNR’s Head of the Rolling Stock Maintenance Department told the Philippines News Agency.

However, there is still no official talks with PNR regarding the payment for the purchase of the train, Besmonte stressed, as they will be checking the design first.

Besmonte said the PNR does not have the number of orders yet, as it is still considering if the locally-designed train is cheaper than imported ones.

He also disclosed that a Korean company was bidding for a similar train set this 2014 at 3.2 million USD, much higher than the 2007 bidding price of 1.67 million USD.

He said that PNR contributed to the design of the train set being assembled with five coaches, the first and only train made by Filipino engineers.

DOST-Materials & Process Research Division Officer-in-Charge Rodnel Tamayo added that assembly of the train set will be completed next year and will be ready for testing latest during the third quarter of 2015.

Tamayo said the train is just awaiting arrival of certain parts, but the train coaches are undergoing fabrication here in the Philippines.

He also pointed out that the train set’s designs and specifications has already been completed.

However, Tamayo stressed that further tests will be made on the train to ensure its sturdiness and bigger capacity.

”This train set was also made in partnership with PNR, so for sure someone will adopt our train set,” Tamayo said.

PNR and DOST has formalized the collaboration, through an earlier signed memorandum of agreement (MOA).

Tamayo said that part of PNR’s responsibilities is to assist on the operation and maintenance of prototype trains, while also permitting them to use PNR’s railway tracks during the testing.

The DOST estimates that the design and development of the train set is currently worth Php 133 million. It is solely funded by the DOST, while PNR provided technical assistance.

He added the train set also has the function of running as a hybrid transport system, capable of running either by diesel or electricity.

In case of brownouts, the train can run on diesel alone through the generator sets installed in the transport unit.

Tamayo explained that the generator sets and motors are imported, but local suppliers are available to provide for the replacement of parts. The motors used in the train set are ABB’s Delta and Mitsubishi’s Teco, while the gensets by Powerasia and Perkins.

Also, the train has the advantage of shortened maintenance time, since parts can be easily purchased in the country.

The train set is capable of accommodating 120 passengers per coach, or the transport of 600 people for every train set which has a full length of 60 meters.

The coach costs Php 20 million each, a lower cost due mostly to locally sourced materials.

The train is projected to run up to a maximum 80 kilometers per hour (KPH), with its 125-horsepower motor.

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Latest

Man in White Dress Shirt Standing Beside Woman in Pink Long Sleeve Shirt Man in White Dress Shirt Standing Beside Woman in Pink Long Sleeve Shirt
Instagram9 hours ago

What kind of diner are you? 6 types of diners who avoid plant-based meat dishes

Imagine having dinner at a restaurant. The menu offers plant-based meat alternatives made mostly from vegetables, mushrooms, legumes and wheat...

Art and Culture10 hours ago

Coast Salish Canoe Culture comes to the Vancouver Maritime Museum

The Vancouver Maritime Museum is delighted to announce their latest exhibition from local səlil ̕wətaʔɬ and Sḵwx̱wú7mesh artist, Zoe George....

Education10 hours ago

TD and ApplyBoard Collaborate to Support Filipino Students Pursuing Studies in Canada

New relationship to help students planning on studying in Canada prepare their finances and expedite their study permits TD and...

Community News10 hours ago

Filipino Community Leaders Celebrate the Federal Funding Commitment for a Filipino Community Cultural Centre in BC

Vancouver, BC — Filipino community leaders and New Democrat Finance Critic MP Don Davies celebrated together the historic inclusion of...

Community News10 hours ago

Emaciated dachshund found trapped in carrier down embankment getting the care he desperately needs

The starved dachshund was found by a Good Samaritan who was driving his truck to get to mountain bike trails...

Entertainment10 hours ago

“Summer For Reel” brings JoshLia’s “Love You to the Stars and Back” in Boracay

With acoustic performances from Maki, Angela Ken, and Bugoy Drillon Beat the heat with this summer’s must-see outdoor screening event,...

Entertainment10 hours ago

Star Cinema and The IdeaFirst Company announce Vice Ganda’s movie comeback in “And The Breadwinner Is”

Asia’s Unkabogable Phenomenal Superstar Vice Ganda is set to return to the big screen once again after a two-year hiatus,...

Entertainment10 hours ago

Joshua and Julia reunite for new movie “Un/happy for you”

Directed by Petersen Vargas, slated for release this 2024 It is the reunion that is not on anybody’s bingo cards...

Canada News11 hours ago

U.S. gov’t paying to upgrade section of Alaska Highway in the Yukon

By Gabrielle Plonka, CBC News $42.6M has been pledged for the project The Alaskan government has pledged $42.6 million for...

A medical worker examines an X-ray of a patient’s lungs. A medical worker examines an X-ray of a patient’s lungs.
Canada News11 hours ago

Inuit leaders disappointed with budget’s lack of money for tuberculosis elimination

By Brett Forester · CBC News Budget pledges $1.1B for First Nations and Inuit health but offers nothing on TB elimination specifically...

WordPress Ads